Ride in comfort and control with full hydraulic suspension and precision braking from the dual hydraulic EABS system. The included bike pedals and motorcycle footpegs allow you to switch between bike and motorcycle modes, and you can enjoy anti-theft protection with the NFC unlock screen.
Rain or shine, dirt or asphalt, the GT73 delivers unstoppable performance. Built for enthusiasts who demand power, range, and durability, this electric dirt bike is ready for your next adventure.
Get ready to ride harder, faster, and farther than ever before!
Riding'times GT73 Off-Road Adult Electric Dirt Bike 48V Long Range 30-50Km/H Top Speed Light Racing Mountain Bike
$962.51
$1283.35
重量規格66 KG
SKU1904430585809289216
Unmatched Safety and Durability
The GT73 is designed by dozens of experienced engineers at Riding'times and has passed rigorous safety tests, including UL2849. It is manufactured and inspected with high standards, ensuring outstanding performance in both quality and user experience.

Model
|
GT73
|
Motor and Battery
|
2000W Rear Gear Hub Motor, 48V / 36.4AH || Removable Dual Battery
|
Range
|
Up to 85 miles per charge (electric-only model), Up to 155 miles per charge (PAS model) [Depends on load, slope, speed,temperature, and surroundings.]
|
Speed
|
30-50km/h(30MPH)
|
Charging Time
|
8-9 hours with 2 chargers and 16-18 hours with 1 charger (2 charger is included in the package).
|
Tires
|
25-inch all-terrain dirt bike tires
|
5" LED Display
|
NFC unlock, Backlit LCD with charge indicator, speedometer, odometer, trip odometer, pedal assist level, and more
|
Brakes
|
Dual hydraulic brakes with 230MM disc brake rotor and EABS
|
Suspension
|
Aluminum Hydraulic Suspension Front Fork and Rear Hydraulic Suspension
|
light
|
3X front lights and an integrated rear light with turn signals, brake light, and tail light
|
for Rider
|
5'5” to 6'3”, and up to 330 lbs
|
We Go The Extra Mile
|
Riding'times frames are designed to meet international standards, including the guidelines set by the U.S Consumer Product Safety Commission and European Committee for Standardization.
|
Additional Features
|
Throttle disable function, speed limit settings, 3 speed modes, triangular storage bag attached to the bike body, motorcycle footpegs included in the package.
|
NOTE-1
|
The Asurion Protection Plan is not affiliated with Riding'times. Riding'times offers 1 year waranty service.
|
NOTE-2
|
1. When assembling the GT73, please be sure to replace the included rear shock absorber. 2. Before using the electric bike, please turn on the red switch on the battery (switch to '1').
|

GT73 Electric Dirt Bike: Unleash the Power, Conquer Any Terrain










Why Choose Us
Shenzhen Tuya Technology Co., Ltd
has been focusing on the development and application of smart mobility tools for short distance since 2013. And we have established a perfect and powerful distribution network system to provide quality products and services to thousands of distributors around the world. After years of development, we now have several overseas warehouses in the EU and USA. Located in Shenzhen, we have our own production line, supply system, strong technical strength and overseas distribution warehouse, owning domestic and foreign invention patents, 42 utility model patents and 38 design patents. Our factory is certified with ISO9001 quality system and ISO140001 environmental management system.
Our Certificates

Packing & Delivery





Our Factory






Exhibitions-Looking For Exclusive Agency Worldwide

FAQ
Q:Are you a factory or trading company?
A:We are an Integration of industry and trade company.
Q: Do you accept OEM and ODM order?
A:Yes, We can do support OEM/ODM/OBM Service.
Q: Do you accept small batch orders?
A:Yes.We are happy to accept it. And we accept small batch mixed orders.
Q:How can we guarantee quality?
A:Always a pre-production sample before mass production;Always final Inspection before shipment.
Q:Why should you buy from us not from other suppliers?
A: We have many years of Electric scooter production and distribution experience, mature logistics network and terminal price
control system. Can provide you with a stable and favorable supply and market competition environment.
Q: What's the lead time?
A: 5 days for sample, 7 days for 50pcs, 15 days for 200pcs and 30 days for 500pcs after order confirmed.
Q: Do you provide a guarantee for after-sales warranty service?
A: Certainly, we offer a one-year warranty. However, buyers need to provide videos and pictures of after-sales faults under the
guidance of the seller for the warranty to take effect.
A:We are an Integration of industry and trade company.
Q: Do you accept OEM and ODM order?
A:Yes, We can do support OEM/ODM/OBM Service.
Q: Do you accept small batch orders?
A:Yes.We are happy to accept it. And we accept small batch mixed orders.
Q:How can we guarantee quality?
A:Always a pre-production sample before mass production;Always final Inspection before shipment.
Q:Why should you buy from us not from other suppliers?
A: We have many years of Electric scooter production and distribution experience, mature logistics network and terminal price
control system. Can provide you with a stable and favorable supply and market competition environment.
Q: What's the lead time?
A: 5 days for sample, 7 days for 50pcs, 15 days for 200pcs and 30 days for 500pcs after order confirmed.
Q: Do you provide a guarantee for after-sales warranty service?
A: Certainly, we offer a one-year warranty. However, buyers need to provide videos and pictures of after-sales faults under the
guidance of the seller for the warranty to take effect.